ITAC Assessment: AS0224
ITAC logo
ITAC Assessment: AS0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Aircraft Parts
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 42,000
ft2
Annual Production 155,844
lb
Production Hrs. Annual 4,125
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,248 1,487,104
kWh
Electricity Demand $8,541 4,850
kW-mo/yr
Electricity Fees $8,774 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,257 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,462

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,256 $5,064 $1,389
28,429
kWh
$867
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $2,518 $4,100 $1,681
34,584
kWh
$837
-
kW-mo/yr
- - - -
03 2.7261: Install timers and/or thermostats $1,335 $525 $1,335
27,550
kWh
- - - - -
04 2.4314: Use synthetic lubricant $388 $670 $69
1,465
kWh
$34
-
kW-mo/yr
- $32
-
gal
- $253
05 2.7447: Install vinyl strip / high speed / air curtain doors $5,108 $3,024 $5,108
105,217
kWh
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $337 $348 $286
5,862
kWh
$51
-
kW-mo/yr
- - - -
07 3.4151: Minimize water usage $2,159 $80 - - $2,159
-
Tgal
- - -
08 3.4114: Replace city water with recycled water via cooling tower $706 $560 - - $706
-
Tgal
- - -
09 3.7131: Use a rag recycle service $450 $30 - - - - $450 -
TOTAL RECOMMENDED $15,257 $14,401 $9,868
203,107
kWh
$1,789
-
kW-mo/yr
$2,865
-
Tgal
$32
-
gal
$450 $253
TOTAL IMPLEMENTED $6,462 $4,735 $3,016
62,134
kWh
$837
-
kW-mo/yr
$2,159
-
Tgal
- $450 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs