Assessment Year | 1998 |
---|---|
Principal Product | Aircraft Parts |
NAICS |
n/a
|
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
42,000
ft2
|
Annual Production | 155,844
lb
|
Production Hrs. Annual | 4,125
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $112,248 | 1,487,104 |
kWh
|
$0.075 |
Electricity Demand | $8,541 | 4,850 |
kW-mo/yr
|
$1.76 |
Electricity Fees | $8,774 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,257 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,462 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,256 | $5,064 |
$1,389
28,429
kWh
|
$867
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $2,518 | $4,100 |
$1,681
34,584
kWh
|
$837
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7261: Install timers and/or thermostats | $1,335 | $525 |
$1,335
27,550
kWh
|
- | - | - | - | - | |
04 | 2.4314: Use synthetic lubricant | $388 | $670 |
$69
1,465
kWh
|
$34
-
kW-mo/yr
|
- |
$32
-
gal
|
- | $253 | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,108 | $3,024 |
$5,108
105,217
kWh
|
- | - | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $337 | $348 |
$286
5,862
kWh
|
$51
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.4151: Minimize water usage | $2,159 | $80 | - | - |
$2,159
-
Tgal
|
- | - | - | |
08 | 3.4114: Replace city water with recycled water via cooling tower | $706 | $560 | - | - |
$706
-
Tgal
|
- | - | - | |
09 | 3.7131: Use a rag recycle service | $450 | $30 | - | - | - | - | $450 | - | |
TOTAL RECOMMENDED | $15,257 | $14,401 |
$9,868
203,107
kWh
|
$1,789
-
kW-mo/yr
|
$2,865
-
Tgal
|
$32
-
gal
|
$450 | $253 | ||
TOTAL IMPLEMENTED | $6,462 | $4,735 |
$3,016
62,134
kWh
|
$837
-
kW-mo/yr
|
$2,159
-
Tgal
|
- | $450 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs