| Assessment Year | 1995 |
|---|---|
| Principal Product | Sub-Assemblies for Aviation Industry |
| NAICS |
n/a
|
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 180 |
| Plant Area |
93,000
ft2
|
| Annual Production | 500,000
pieces
|
| Production Hrs. Annual | 4,488
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $248,574 | 3,586,460 |
kWh
|
$0.069 |
| Natural Gas | $8,256 | 1,315 |
MMBtu
|
$6.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,276 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,762 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $418 | $500 |
$418
6,448
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,821 | $750 |
$2,821
42,790
kWh
|
- | |
| 03 | 2.4314: Use synthetic lubricant | $1,941 | - |
$1,941
35,463
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,414 | $36,039 |
$11,414
170,281
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $855 | $2,592 |
$855
12,896
kWh
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $315 | $500 | - |
$315
-
MMBtu
|
|
| 07 | 2.2511: Insulate bare equipment | $859 | $368 |
$859
18,464
kWh
|
- | |
| 08 | 2.4133: Use most efficient type of electric motors | $5,336 | $9,686 |
$5,336
73,564
kWh
|
- | |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $310 | - |
$310
8,206
kWh
|
- | |
| 10 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $2,007 | $10,000 |
$2,007
42,790
kWh
|
- | |
| TOTAL RECOMMENDED | $26,276 | $60,435 |
$25,961
410,902
kWh
|
$315
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,762 | $750 |
$4,762
78,253
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs