ITAC Assessment: AS0155
ITAC logo
ITAC Assessment: AS0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Sub-Assemblies for Aviation Industry
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 93,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,488
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $248,574 3,586,460
kWh
Natural Gas $8,256 1,315
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,276 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,762

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $418 $500 $418
6,448
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,821 $750 $2,821
42,790
kWh
-
03 2.4314: Use synthetic lubricant $1,941 - $1,941
35,463
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,414 $36,039 $11,414
170,281
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $855 $2,592 $855
12,896
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $315 $500 - $315
-
MMBtu
07 2.2511: Insulate bare equipment $859 $368 $859
18,464
kWh
-
08 2.4133: Use most efficient type of electric motors $5,336 $9,686 $5,336
73,564
kWh
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $310 - $310
8,206
kWh
-
10 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $2,007 $10,000 $2,007
42,790
kWh
-
TOTAL RECOMMENDED $26,276 $60,435 $25,961
410,902
kWh
$315
-
MMBtu
TOTAL IMPLEMENTED $4,762 $750 $4,762
78,253
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs