ITAC Assessment: AM0359
ITAC logo
ITAC Assessment: AM0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Injection molded plastic pails
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 135,000
ft2
Annual Production 27,100,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $408,495 14,352,286
kWh
Electricity Demand $152,647 23,943
kW-mo/yr
Natural Gas $6,231 1,849
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,861 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,475

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $7,930 $1,340 $6,040
211,899
kWh
$1,890
-
kW-mo/yr
- - -
02 2.3134: Shift from daytime to nighttime operation $4,270 - - $4,270
-
kW-mo/yr
- - -
03 4.445: Install equipment to move product $3,430 $100 - - - $3,430 -
04 2.7124: Make a practice of turning off lights when not needed $3,120 - $3,120
109,320
kWh
- - - -
05 2.7145: Install skylights $1,840 $4,000 $1,840
64,771
kWh
- - - -
06 2.4221: Install compressor air intakes in coolest locations $1,350 $560 $1,030
36,342
kWh
$320
-
kW-mo/yr
- - -
07 2.7124: Make a practice of turning off lights when not needed $1,426 $384 $1,810
63,599
kWh
- - $(-384.0) -
08 3.5316: Contract a wood pallet recycling company $700 - - - $700
-
lb
- -
09 2.7124: Make a practice of turning off lights when not needed $340 $26 $340
12,016
kWh
- - - -
10 4.821: Pay bills on time to avoid late fees $235 - - - - - $235
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $220 $90 $220
7,913
kWh
- - - -
TOTAL RECOMMENDED $24,861 $6,500 $14,400
505,860
kWh
$6,480
-
kW-mo/yr
$700
-
lb
$3,046 $235
TOTAL IMPLEMENTED $18,475 $2,116 $7,630
268,170
kWh
$6,480
-
kW-mo/yr
$700
-
lb
$3,430 $235
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs