ITAC Assessment: RU0014
ITAC logo
ITAC Assessment: RU0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product FIBER DRUMS
NAICS
n/a
SIC 2655: Fiber Cans, Tubes, Drums, and Similar Products
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area
n/a
Annual Production 3,600
ton
Production Hrs. Annual 4,420
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,248 1,237,104
kWh
Natural Gas $16,447 3,072
MMBtu
Fuel Oil #2 $12,258 3,318
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,124 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,469

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $925 $200 $925
9,965
kWh
- -
02 2.4312: Improve lubrication practices $266 - $266
2,931
kWh
- -
03 2.7243: Improve air circulation with destratification fans / other methods $389 $500 $(-44.0)
(-586)
kWh
$433
-
MMBtu
-
04 2.7233: Use properly designed and sized hvac equipment $5,240 $7,010 - $(-7,018.0)
-
MMBtu
$12,258
-
MMBtu
05 2.2511: Insulate bare equipment $1,304 $600 $1,304
14,068
kWh
- -
TOTAL RECOMMENDED $8,124 $8,310 $2,451
26,378
kWh
$(-6,585.0)
-
MMBtu
$12,258
-
MMBtu
TOTAL IMPLEMENTED $7,469 $7,810 $2,229
24,033
kWh
$(-7,018.0)
-
MMBtu
$12,258
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs