| Assessment Year | 2005 |
|---|---|
| Principal Product | Automotive/aircraft parts |
| NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
135,000
ft2
|
| Annual Production | 150,000,000
pieces
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $436,954 | 7,211,154 |
kWh
|
$0.061 |
| Electricity Demand | $97,015 | 42,365 |
kW-mo/yr
|
$2.29 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $119,018 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $119,018 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $37,489 | $5,000 |
$35,599
497,893
kWh
|
$1,890
-
kW-mo/yr
|
|
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $37,178 | $15,000 |
$35,582
497,655
kWh
|
$1,596
-
kW-mo/yr
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $23,601 | $2,000 |
$22,411
313,433
kWh
|
$1,190
-
kW-mo/yr
|
|
| 04 | 2.4226: Use / purchase optimum sized compressor | $15,470 | $14,400 |
$14,690
205,451
kWh
|
$780
-
kW-mo/yr
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,173 | $10,610 |
$3,994
55,863
kWh
|
$179
-
kW-mo/yr
|
|
| 06 | 2.7124: Make a practice of turning off lights when not needed | $762 | $25 |
$718
10,046
kWh
|
$44
-
kW-mo/yr
|
|
| 07 | 2.9112: Use solar heat to heat water | $345 | $2,800 |
$343
4,801
kWh
|
$2
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $119,018 | $49,835 |
$113,337
1,585,142
kWh
|
$5,681
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $119,018 | $49,835 |
$113,337
1,585,142
kWh
|
$5,681
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs