ITAC Assessment: AS0060
ITAC logo
ITAC Assessment: AS0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FLOUR TORTILLAS
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 29,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,308 2,961,899
kWh
Natural Gas $140,953 31,998
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $3,687 $91,000 $23,428
374,267
kWh
$(-14,127.0)
-
MMBtu
$(-5,614.0)
02 2.7226: Use computer programs to optimize hvac performance $3,884 $4,112 $3,884
62,134
kWh
- -
03 2.7422: Plant trees or shrubs near windows to shield from sunlight $326 $600 $326
5,275
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,371 $2,875 $1,371
21,981
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $273 $5,904 $325
5,275
kWh
- $(-52.0)
06 2.6232: Install set-back timers $486 $750 $486
7,913
kWh
- -
07 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $4,703 $700 $4,703
75,029
kWh
- -
08 2.4133: Use most efficient type of electric motors $442 $2,036 $442
7,034
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $638 $300 $638
10,258
kWh
- -
10 2.4312: Improve lubrication practices $479 $546 $479
7,620
kWh
- -
TOTAL RECOMMENDED $16,289 $108,823 $36,082
576,786
kWh
$(-14,127.0)
-
MMBtu
$(-5,666.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs