Assessment Year | 1992 |
---|---|
Principal Product | ELECTRICITY DISTRIBUTION COMPONENTS |
NAICS |
n/a
|
SIC | 3613: Switchgear and Switchboard Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $248,683 | 4,152,990 |
kWh
|
$0.060 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,863 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $200 | $2,625 |
$200
3,224
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $668 | - |
$668
11,137
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,023 | $13,239 |
$3,023
50,410
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $959 | $867 |
$1,148
19,050
kWh
|
$(-189.0) | |
05 | 2.6232: Install set-back timers | $823 | $300 |
$823
13,775
kWh
|
- | |
06 | 2.7123: Keep lamps and reflectors clean | $3,547 | $13,157 |
$3,547
59,203
kWh
|
- | |
07 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $5,341 | $9,500 |
$5,341
89,097
kWh
|
- | |
08 | 2.7221: Lower temperature during the winter season and vice-versa | $9,205 | - |
$9,205
153,869
kWh
|
- | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $739 | $300 |
$739
12,309
kWh
|
- | |
10 | 2.2136: Install / repair insulation on steam lines | $358 | $113 |
$358
5,862
kWh
|
- | |
TOTAL RECOMMENDED | $24,863 | $40,101 |
$25,052
417,936
kWh
|
$(-189.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs