ITAC Assessment: MZ0024
ITAC logo
ITAC Assessment: MZ0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product shopping carts
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 600,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,500
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,605 2,400,000
kWh
Natural Gas $190,787 18,543
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,709 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,945

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $764 $900 $764
12,737
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $27,181 $32,800 $27,181
453,258
kWh
-
03 2.4237: Substitute compressed air cooling with water or air cooling $828 $370 $828
13,806
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,506 $5,600 $5,506
97,500
kWh
-
05 2.2515: Use optimum thickness insulation $430 $800 - $430
-
MMBtu
TOTAL RECOMMENDED $34,709 $40,470 $34,279
577,301
kWh
$430
-
MMBtu
TOTAL IMPLEMENTED $27,945 $33,700 $27,945
465,995
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs