ITAC Assessment: MI0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Fabricated Structural Metal Manufacturing
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 33
Plant Area 350,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,019 1,237,004
kWh
Electricity Fees $5,903 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,528 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,923

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4322: Use or replace with energy efficient substitutes $15,757 $91,089 $15,757
144,550
kWh
02 2.7135: Install occupancy sensors $2,089 $4,173 $2,089
19,169
kWh
03 2.7135: Install occupancy sensors $1,829 $4,802 $1,829
16,773
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,769 $1,660 $1,769
16,232
kWh
05 2.6218: Turn off equipment when not in use $544 $208 $544
4,992
kWh
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,605 $80 $1,605
14,724
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,935 $3,315 $1,935
17,747
kWh
TOTAL RECOMMENDED $25,528 $105,327 $25,528
234,187
kWh
TOTAL IMPLEMENTED $23,923 $105,247 $23,923
219,463
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs