ITAC Assessment: AS0043
ITAC logo
ITAC Assessment: AS0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product COMPUTER TERMINALS
NAICS
n/a
SIC 3575: Computer Terminals
Sales Range $100
M
to 500
M
# of Employees 445
Plant Area
n/a
Annual Production 103,200
pieces
Production Hrs. Annual 2,450
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $618,508 9,825,029
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,008 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,008

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7221: Lower temperature during the winter season and vice-versa $49,398 - $49,398
797,773
kWh
-
02 2.7422: Plant trees or shrubs near windows to shield from sunlight $4,234 $15,000 $4,234
67,409
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $502 $176 $726
11,723
kWh
$(-224.0)
04 2.6232: Install set-back timers $818 $1,575 $818
13,189
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $236 $212 $236
3,810
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $572 $830 $572
9,379
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $124 $100 $124
2,052
kWh
-
08 2.4312: Improve lubrication practices $124 - $124
2,052
kWh
-
TOTAL RECOMMENDED $56,008 $17,893 $56,232
907,387
kWh
$(-224.0)
TOTAL IMPLEMENTED $56,008 $17,893 $56,232
907,387
kWh
$(-224.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs