ITAC Assessment: AR0167
ITAC logo
ITAC Assessment: AR0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Wood products - reconstituted
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 126
Plant Area 254,525
ft2
Annual Production 140,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,002,873 117,850,529
kWh
Electricity Demand $2,365,802 182,970
kW-mo/yr
Natural Gas $2,560,176 1,098,788
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,590,883 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,306

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings
01 2.7135: Install occupancy sensors $5,846 $2,240 $3,127
184,056
kWh
$2,719
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $4,264 $5,441 $1,932
113,716
kWh
$2,332
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $3,657 $250 $1,646
96,717
kWh
$2,011
-
kW-mo/yr
- -
04 2.2135: Repair and eliminate steam leaks $7,742 $205 - - $7,742
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,523 - $730
43,083
kWh
$793
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,567 $200 $792
46,600
kWh
$775
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,681 $8,274 $1,991
117,233
kWh
$2,690
-
kW-mo/yr
- -
08 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $2,390,400 $4,500,000 $1,149,120
67,219,813
kWh
$1,241,280
-
kW-mo/yr
- -
09 2.2136: Install / repair insulation on steam lines $3,707 $1,791 - - $3,707
-
MMBtu
-
10 2.2515: Use optimum thickness insulation $86,793 $85,710 - - $86,793
-
MMBtu
-
11 4.446: Automate finishing process $80,703 $51,700 - - - $80,703
TOTAL RECOMMENDED $2,590,883 $4,655,811 $1,159,338
67,821,218
kWh
$1,252,600
-
kW-mo/yr
$98,242
-
MMBtu
$80,703
TOTAL IMPLEMENTED $28,306 $10,127 $8,227
484,172
kWh
$8,630
-
kW-mo/yr
$11,449
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs