ITAC Assessment: AR0147
ITAC logo
ITAC Assessment: AR0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Standard Hex Head Fasteners
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 109
Plant Area 290,260
ft2
Annual Production 17,832
ton
Production Hrs. Annual 8,400
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $304,537 10,439,918
kWh
Electricity Demand $152,807 22,638
kW-mo/yr
Natural Gas $395,827 127,413
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Water Consumption Savings Primary Product Savings
01 2.2511: Insulate bare equipment $1,129 $464 - - $1,129
-
MMBtu
- - - - - -
02 2.7111: Reduce illumination to minimum necessary levels $645 $60 $421
14,654
kWh
$224
-
kW-mo/yr
- - - - - - -
03 2.4221: Install compressor air intakes in coolest locations $986 $160 $743
25,498
kWh
$243
-
kW-mo/yr
- - - - - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,700 - $2,777
72,392
kWh
$923
-
kW-mo/yr
- - - - - - -
05 2.4133: Use most efficient type of electric motors $2,406 $8,100 $1,806
62,427
kWh
$600
-
kW-mo/yr
- - - - - - -
06 3.8142: Distill contaminated solvents for reuse $2,387 - $(-90.0)
(-879)
kWh
- - - $1,877
-
gal
$(-3,000.0) $3,600 - -
07 3.5131: Recycle white water $5,032 - $(-58.0)
(-1,465)
kWh
- - $2,884
-
Tgal
- - - $2,206
-
Tgal
-
08 4.611: Begin a practice of predictive / preventative maintenance $26,479 $19,950 - - - - - $(-21,735.0) - - $48,214
TOTAL RECOMMENDED $42,764 $28,734 $5,599
172,627
kWh
$1,990
-
kW-mo/yr
$1,129
-
MMBtu
$2,884
-
Tgal
$1,877
-
gal
$(-24,735.0) $3,600 $2,206
-
Tgal
$48,214
TOTAL IMPLEMENTED - - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs