Assessment Year | 1998 |
---|---|
Principal Product | Auto Lifts, Pipe Benders, Oil Filter Crushers |
NAICS |
n/a
|
SIC | 3549: Metalworking Machinery, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 71 |
Plant Area |
119,825
ft2
|
Annual Production | 2,440
pieces
|
Production Hrs. Annual | 2,190
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,621 | 813,013 |
kWh
|
$0.081 |
Electricity Demand | $13,902 | 3,950 |
kW-mo/yr
|
$3.52 |
Natural Gas | $26,758 | 4,975 |
MMBtu
|
$5.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,654 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,013 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,674 | $300 |
$2,789
34,584
kWh
|
$885
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $269 | $460 |
$218
2,638
kWh
|
$51
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $619 | - |
$504
6,155
kWh
|
$115
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.6232: Install set-back timers | $1,859 | $2,080 | - | - |
$1,859
-
MMBtu
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,363 | $150 |
$1,101
13,482
kWh
|
$262
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $383 | $120 |
$309
3,810
kWh
|
$74
-
kW-mo/yr
|
- | - | - | - | |
07 | 4.131: Modify process to reduce material use/cost | $6,960 | $10,000 | - | - | - | $3,600 | - | $3,360 | |
08 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $12,233 | $2,000 | - | - | - | $324 | $10,685 | $1,224 | |
09 | 4.513: Re-arrange equipment layout to reduce labor costs | $19,710 | $2,250 | - | - | - | $19,710 | - | - | |
10 | 4.621: Use fixtures to reduce machine changeout times | $584 | $337 | - | - | - | $584 | - | - | |
TOTAL RECOMMENDED | $47,654 | $17,697 |
$4,921
60,669
kWh
|
$1,387
-
kW-mo/yr
|
$1,859
-
MMBtu
|
$24,218 | $10,685 | $4,584 | ||
TOTAL IMPLEMENTED | $43,013 | $16,940 |
$1,823
22,275
kWh
|
$428
-
kW-mo/yr
|
$1,859
-
MMBtu
|
$23,634 | $10,685 | $4,584 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs