Assessment Year | 1998 |
---|---|
Principal Product | Automotive Accessories and Plating Operation |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 138 |
Plant Area |
130,000
ft2
|
Annual Production | 2,646,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $151,593 | 2,536,342 |
kWh
|
$0.060 |
Natural Gas | $83,080 | 18,716 |
MMBtu
|
$4.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,931 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,982 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,369 | $100 |
$1,369
22,860
kWh
|
- | - | - | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $463 | $530 |
$463
7,620
kWh
|
- | - | - | - | - | |
03 | 2.2437: Recover waste heat from equipment | $613 | $102 | - |
$613
-
MMBtu
|
- | - | - | - | |
04 | 2.2135: Repair and eliminate steam leaks | $546 | $240 | - |
$546
-
MMBtu
|
- | - | - | - | |
05 | 2.2136: Install / repair insulation on steam lines | $1,531 | $467 | - |
$1,531
-
MMBtu
|
- | - | - | - | |
06 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $4,930 | $8,000 |
$(-42.0)
(-586)
kWh
|
- | - |
$5,692
-
lb
|
$(-720.0) | - | |
07 | 3.5131: Recycle white water | $5,280 | $2,075 |
$(-228.0)
(-3,810)
kWh
|
- |
$3,060
-
Tgal
|
- | - |
$2,448
-
Tgal
|
|
08 | 4.112: Replace old machine with new automatic multi-station tool | $50,674 | $88,000 | - | - | - | - | $50,674 | - | |
09 | 3.2176: Increase use of automation | $15,525 | $30,000 | - | - | - | - | $15,525 | - | |
TOTAL RECOMMENDED | $80,931 | $129,514 |
$1,562
26,084
kWh
|
$2,690
-
MMBtu
|
$3,060
-
Tgal
|
$5,692
-
lb
|
$65,479 |
$2,448
-
Tgal
|
||
TOTAL IMPLEMENTED | $1,982 | $202 |
$1,369
22,860
kWh
|
$613
-
MMBtu
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs