ITAC Assessment: AR0112
ITAC logo
ITAC Assessment: AR0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Wood Furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area 102,500
ft2
Annual Production 75,000
pieces
Production Hrs. Annual 4,484
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $294,076 14,097,597
kWh
Electricity Demand $414,002 21,923
kW-mo/yr
Natural Gas $34,655 8,892
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,433 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,807

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,660 $520 $7,955
99,648
kWh
$705
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $2,364 $100 $2,100
26,671
kWh
$264
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $2,179 $5,400 - $2,179
-
kW-mo/yr
- - -
04 2.7111: Reduce illumination to minimum necessary levels $1,399 $157 $1,196
15,240
kWh
$203
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $5,214 $6,200 $4,514
57,151
kWh
$700
-
kW-mo/yr
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,010 - $884
11,137
kWh
$126
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,390 $279 $1,168
14,654
kWh
$222
-
kW-mo/yr
- - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $14,497 $6,000 - - - $14,497
-
lb
-
09 3.8143: Recycle cleaning solvent and reuse $1,720 $6,000 - - $1,720
-
gal
- -
10 4.446: Automate finishing process $60,000 $15,000 - - - - $60,000
TOTAL RECOMMENDED $98,433 $39,656 $17,817
224,501
kWh
$4,399
-
kW-mo/yr
$1,720
-
gal
$14,497
-
lb
$60,000
TOTAL IMPLEMENTED $19,807 $12,499 $15,737
198,124
kWh
$4,070
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs