ITAC Assessment: AR0079
ITAC logo
ITAC Assessment: AR0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Polystyrene Foam Trays
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 2,000,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $294,076 14,097,597
kWh
Electricity Demand $414,002 21,923
kW-mo/yr
Electricity Fees $1,329 -
Natural Gas $34,655 8,892
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,368 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,856

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $889 $263 $366
17,585
kWh
$523
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $2,954 $1,960 $1,096
52,169
kWh
$1,858
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $2,788 $100 $1,247
59,203
kWh
$1,541
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,148 $110 $1,414
67,116
kWh
$1,734
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $5,725 $6,180 $2,448
116,647
kWh
$3,277
-
kW-mo/yr
- -
06 2.7261: Install timers and/or thermostats $8,393 $3,100 - - $8,393
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,187 $160 $1,187
56,565
kWh
- - -
08 2.4235: Remove or close off unneeded compressed air lines $3,276 $1,000 $1,468
70,047
kWh
$1,808
-
kW-mo/yr
- -
09 3.4151: Minimize water usage $8 $10 - - - $8
-
Tgal
TOTAL RECOMMENDED $28,368 $12,883 $9,226
439,332
kWh
$10,741
-
kW-mo/yr
$8,393
-
MMBtu
$8
-
Tgal
TOTAL IMPLEMENTED $12,856 $6,560 $6,296
299,531
kWh
$6,552
-
kW-mo/yr
- $8
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs