| Assessment Year | 2026 |
|---|---|
| Principal Product | Quartz Equipment |
| NAICS | 327999: All Other Miscellaneous Nonmetallic Mineral Product Manufacturing |
| SIC | 3299: Nonmetallic Mineral Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 75 |
| Plant Area |
35,000
ft2
|
| Annual Production | 30,000
units
|
| Production Hrs. Annual | 2,750
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $200,220 | 2,850,900 |
kWh
|
$0.070 | |
| Electricity Demand | $147,860 | 9,242 |
kW-mo/yr
|
$16.00 | |
| Electricity Fees | $4,200 | - |
|
- | |
| Waste Disposal Costs | |||||
| Water Usage | $12,547 | 568 |
Tgal
|
$22.09 | |
| Water Disposal | $4,484 | 568 |
Tgal
|
$7.89 | |
| TOTAL YEARLY COSTS | $369,311 | ||||
| RECOMMENDED SAVINGS* | $88,620 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4239: Eliminate or reduce compressed air usage | $7,410 | $520 |
$7,410
105,900
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,660 | $1,480 |
$6,580
93,960
kWh
|
$2,080
-
kW-mo/yr
|
|
| 03 | 2.7261: Install timers and/or thermostats | $11,780 | $1,840 |
$11,780
168,340
kWh
|
- | |
| 04 | 2.4226: Use / purchase optimum sized compressor | $6,550 | $13,740 |
$3,480
49,690
kWh
|
$3,070
-
kW-mo/yr
|
|
| 05 | 2.7232: Replace existing hvac unit with high efficiency model | $54,220 | $405,000 |
$28,620
408,900
kWh
|
$25,600
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $88,620 | $422,580 |
$57,870
826,790
kWh
|
$30,750
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs