ITAC Assessment: AM0968
ITAC logo
ITAC Assessment: AM0968
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Quartz Equipment
NAICS 327999: All Other Miscellaneous Nonmetallic Mineral Product Manufacturing
SIC 3299: Nonmetallic Mineral Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 35,000
ft2
Annual Production 30,000
units
Production Hrs. Annual 2,750
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $200,220 2,850,900
kWh
Electricity Demand $147,860 9,242
kW-mo/yr
Electricity Fees $4,200 -
Waste Disposal Costs
Water Usage $12,547 568
Tgal
Water Disposal $4,484 568
Tgal
TOTAL YEARLY COSTS $369,311
RECOMMENDED SAVINGS* $88,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4239: Eliminate or reduce compressed air usage $7,410 $520 $7,410
105,900
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,660 $1,480 $6,580
93,960
kWh
$2,080
-
kW-mo/yr
03 2.7261: Install timers and/or thermostats $11,780 $1,840 $11,780
168,340
kWh
-
04 2.4226: Use / purchase optimum sized compressor $6,550 $13,740 $3,480
49,690
kWh
$3,070
-
kW-mo/yr
05 2.7232: Replace existing hvac unit with high efficiency model $54,220 $405,000 $28,620
408,900
kWh
$25,600
-
kW-mo/yr
TOTAL RECOMMENDED $88,620 $422,580 $57,870
826,790
kWh
$30,750
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs