Assessment Year | 1992 |
---|---|
Principal Product | GROUND HAM AND BEEF |
NAICS |
n/a
|
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $10 M to 50M |
# of Employees | 14 |
Plant Area |
n/a
|
Annual Production | 5,260,000
lb
|
Production Hrs. Annual | 4,572
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,341 | 1,348,183 |
kWh
|
$0.053 |
Natural Gas | $28,691 | 7,822 |
MMBtu
|
$3.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,619 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,131 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6232: Install set-back timers | $1,480 | $110 |
$1,480
49,824
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $990 | $1,290 |
$990
14,947
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $115 | - |
$216
4,982
kWh
|
- | $(-101.0) | |
04 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $640 | $3,000 | - |
$640
-
MMBtu
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $483 | $360 | - |
$483
-
MMBtu
|
- | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $410 | $110 |
$410
7,913
kWh
|
- | - | |
07 | 2.4312: Improve lubrication practices | $363 | - |
$363
7,620
kWh
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $230 | - |
$230
3,517
kWh
|
- | - | |
09 | 2.4133: Use most efficient type of electric motors | $468 | $348 |
$468
8,792
kWh
|
- | - | |
10 | 2.2511: Insulate bare equipment | $160 | $300 |
$160
4,103
kWh
|
- | - | |
11 | 2.8112: Combine utility meters | $150 | $110 | - |
$150
-
MMBtu
|
- | |
12 | 2.4221: Install compressor air intakes in coolest locations | $130 | $50 |
$130
2,638
kWh
|
- | - | |
TOTAL RECOMMENDED | $5,619 | $5,678 |
$4,447
104,336
kWh
|
$1,273
-
MMBtu
|
$(-101.0) | ||
TOTAL IMPLEMENTED | $4,131 | $2,220 |
$3,749
92,027
kWh
|
$483
-
MMBtu
|
$(-101.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs