ITAC Assessment: AM0114
ITAC logo
ITAC Assessment: AM0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DATA ACQUISITION SYSTEMS
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $10
M
to 50
M
# of Employees 137
Plant Area
n/a
Annual Production 800
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,640 2,136,870
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,201 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7229: Air condition only space necessary $8,432 $2,900 $8,432
-
kWh
02 2.7226: Use computer programs to optimize hvac performance $5,900 $13,600 $5,900
-
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $635 $205 $635
7,034
kWh
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,700 - $1,700
-
kWh
05 2.8123: Pay utility bills on time $286 - $286
-
kWh
06 2.6232: Install set-back timers $160 - $160
5,862
kWh
07 2.7261: Install timers and/or thermostats $88 $15 $88
3,224
kWh
TOTAL RECOMMENDED $17,201 $16,720 $17,201
16,120
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs