ITAC Assessment: AM0107
ITAC logo
ITAC Assessment: AM0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product TRUCK TRAILERS
NAICS
n/a
SIC 3715: Truck Trailers
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area
n/a
Annual Production 2,960
pieces
Production Hrs. Annual 4,267
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,570 5,055,393
kWh
Natural Gas $44,576 20,190
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,073

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $12,100 - $12,100
448,417
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,000 $400 $4,000
146,542
kWh
-
03 2.4133: Use most efficient type of electric motors $438 $2,272 $438
4,689
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,730 $2,400 $2,730
47,773
kWh
-
05 2.6232: Install set-back timers $750 $260 $750
12,603
kWh
-
06 2.6212: Turn off equipment during breaks, reduce operating time $650 - $650
24,033
kWh
-
07 2.7261: Install timers and/or thermostats $405 $130 $170
6,448
kWh
$235
-
MMBtu
TOTAL RECOMMENDED $21,073 $5,462 $20,838
690,505
kWh
$235
-
MMBtu
TOTAL IMPLEMENTED $21,073 $5,462 $20,838
690,505
kWh
$235
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs