ITAC Assessment: TN0226
ITAC logo
ITAC Assessment: TN0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product MOLDED PLASTIC PRODUCTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 190
Plant Area
n/a
Annual Production 780,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $249,912 5,402,110
kWh
Natural Gas $19,603 3,835
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,918

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $24,450 $5,000 $19,390
419,109
kWh
$5,060
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,593 $2,240 - $1,593
-
MMBtu
03 2.7243: Improve air circulation with destratification fans / other methods $2,315 $5,800 - $2,315
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,424 $45 $5,424
117,233
kWh
-
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,987 - $3,987
86,166
kWh
-
06 2.2511: Insulate bare equipment $1,451 $1,000 $1,451
31,360
kWh
-
TOTAL RECOMMENDED $39,220 $14,085 $30,252
653,868
kWh
$8,968
-
MMBtu
TOTAL IMPLEMENTED $32,918 $8,285 $26,265
567,702
kWh
$6,653
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs