ITAC Assessment: AM0106
ITAC logo
ITAC Assessment: AM0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product OIL PUMPING UNITS
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 245
Plant Area
n/a
Annual Production 1,133
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $249,327 4,857,562
kWh
Natural Gas $43,016 19,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,601 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2711: Utilize outside air instead of conditioned air for drying $6,600 $24,750 - $6,600
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $221 $144 $221
3,224
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $375 $500 $375
14,068
kWh
-
04 2.6232: Install set-back timers $198 $260 $198
7,327
kWh
-
05 2.7261: Install timers and/or thermostats $127 $260 $60
2,345
kWh
$67
-
MMBtu
06 2.2532: Use only amount of air necessary to prevent explosion hazard $80 - $80
2,931
kWh
-
TOTAL RECOMMENDED $7,601 $25,914 $934
29,895
kWh
$6,667
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs