Assessment Year | 1990 |
---|---|
Principal Product | PIPE THREADS & COUPLINGS |
NAICS |
n/a
|
SIC | 3498: Fabricated Pipe and Pipe Fittings |
Sales Range | $10 M to 50M |
# of Employees | 162 |
Plant Area |
n/a
|
Annual Production | 60,000
pieces
|
Production Hrs. Annual | 5,500
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $314,254 | 6,426,143 |
kWh
|
$0.049 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,130 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,370 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $8,500 | $27,000 |
$21,000
498,242
kWh
|
$(-12,500.0)
-
MMBtu
|
|
02 | 2.3212: Optimize plant power factor | $7,790 | $21,500 |
$7,790
-
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,600 | $500 |
$4,600
169,695
kWh
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $4,000 | - |
$4,000
149,472
kWh
|
- | |
05 | 2.6232: Install set-back timers | $3,860 | - |
$3,860
143,611
kWh
|
- | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,800 | $400 |
$1,800
67,409
kWh
|
- | |
07 | 2.4312: Improve lubrication practices | $1,400 | - |
$1,400
51,290
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $180 | $170 |
$180
2,638
kWh
|
- | |
TOTAL RECOMMENDED | $32,130 | $49,570 |
$44,630
1,082,357
kWh
|
$(-12,500.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $18,370 | $22,570 |
$18,370
389,214
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs