ITAC Assessment: AM0087
ITAC logo
ITAC Assessment: AM0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SMALL FREEZERS
NAICS
n/a
SIC 3632: Household Refrigerators and HOme and Farm Freezers
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 1,220,000
pieces
Production Hrs. Annual 4,267
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,508 2,123,974
kWh
Natural Gas $97,271 23,478
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,229 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,369

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $7,245 $18,000 - $7,245
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $4,860 $18,900 $(-3,380.0)
(-47,479)
kWh
$8,240
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,580 $700 $2,580
83,529
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $465 $465 $465
15,240
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $79 $62 $79
1,172
kWh
-
TOTAL RECOMMENDED $15,229 $38,127 $(-256.0)
52,462
kWh
$15,485
-
MMBtu
TOTAL IMPLEMENTED $10,369 $19,227 $3,124
99,941
kWh
$7,245
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs