ITAC Assessment: SD0421
ITAC logo
ITAC Assessment: SD0421
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product COOKIES AND CRACKERS
NAICS 311821: Cookie and Cracker Manufacturing
SIC 2052: Cookies and Crackers
Sales Range less than $500
k
# of Employees 700
Plant Area 150,000
ft2
Annual Production 450
units
Production Hrs. Annual 5,824
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $754,508 8,447,220
kWh
Electricity Demand $225,737 19,543
kW-mo/yr
Electricity Fees $141 -
Natural Gas $566,911 59,831
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $511,167 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,401

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,500 $6,463 $14,500
162,926
kWh
- -
02 2.1221: Replace obsolete burners with more efficient ones $35,684 $50,000 - - $35,684
-
MMBtu
03 2.2449: Recover heat from exhausted steam, hot air or hot water $94,850 $12,450 - - $94,850
-
MMBtu
04 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $269,651 $1,430,000 $269,651
8,760,000
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,149 $2,700 $13,149
147,741
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $21,991 $16,630 $18,676
209,140
kWh
$3,315
-
kW-mo/yr
-
07 2.2622: Replace existing chiller with high efficiency model $60,774 $175,800 $48,011
537,636
kWh
$12,763
-
kW-mo/yr
-
08 2.4133: Use most efficient type of electric motors $568 $1,444 $325
3,640
kWh
$243
-
kW-mo/yr
-
TOTAL RECOMMENDED $511,167 $1,695,487 $364,312
9,821,083
kWh
$16,321
-
kW-mo/yr
$130,534
-
MMBtu
TOTAL IMPLEMENTED $49,401 $54,144 $13,474
151,381
kWh
$243
-
kW-mo/yr
$35,684
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs