Assessment Year | 1990 |
---|---|
Principal Product | SHELL TUBE HEAT EXCHANGE MANUFACTURE |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 128 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 5,872
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $81,475 | 1,283,998 |
kWh
|
$0.063 |
Natural Gas | $10,426 | 2,415 |
MMBtu
|
$4.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,487 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,487 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,755 | $1,000 |
$4,755
95,545
kWh
|
- | |
02 | 2.2437: Recover waste heat from equipment | $2,615 | $2,600 | - |
$2,615
-
MMBtu
|
|
03 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $2,370 | $7,060 |
$2,370
47,479
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $282 | $606 |
$282
4,103
kWh
|
- | |
05 | 2.6232: Install set-back timers | $270 | - |
$270
5,275
kWh
|
- | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $105 | - |
$105
2,052
kWh
|
- | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $90 | - |
$90
1,758
kWh
|
- | |
TOTAL RECOMMENDED | $10,487 | $11,266 |
$7,872
156,212
kWh
|
$2,615
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,487 | $11,266 |
$7,872
156,212
kWh
|
$2,615
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs