ITAC Assessment: AM0084
ITAC logo
ITAC Assessment: AM0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SHELL TUBE HEAT EXCHANGE MANUFACTURE
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 128
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,872
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,475 1,283,998
kWh
Natural Gas $10,426 2,415
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,487 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,487

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,755 $1,000 $4,755
95,545
kWh
-
02 2.2437: Recover waste heat from equipment $2,615 $2,600 - $2,615
-
MMBtu
03 2.4222: Install adequate dryers on air lines to eliminate blowdown $2,370 $7,060 $2,370
47,479
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $282 $606 $282
4,103
kWh
-
05 2.6232: Install set-back timers $270 - $270
5,275
kWh
-
06 2.6212: Turn off equipment during breaks, reduce operating time $105 - $105
2,052
kWh
-
07 2.6212: Turn off equipment during breaks, reduce operating time $90 - $90
1,758
kWh
-
TOTAL RECOMMENDED $10,487 $11,266 $7,872
156,212
kWh
$2,615
-
MMBtu
TOTAL IMPLEMENTED $10,487 $11,266 $7,872
156,212
kWh
$2,615
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs