ITAC Assessment: AS0318
ITAC logo
ITAC Assessment: AS0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Plastic Beverage Bottles
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 130,000
ft2
Annual Production 210,000,000
pieces
Production Hrs. Annual 8,688
hrs
Location (State) Arizona
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $540,792 11,584,800
kWh
Electricity Demand $110,790 20,748
kW-mo/yr
Electricity Fees $34,339 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $676,683 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $676,683

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $4,443 $600 $4,316
65,594
kWh
$127
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $1,055 $2,106 $920
13,988
kWh
$135
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $155 $600 $105
1,606
kWh
$50
-
kW-mo/yr
- - -
04 3.1163: Use plastic pallets instead of wood $147,420 $166,600 - - - - $147,420
05 3.4151: Minimize water usage $6,973 $720 - - $6,973
-
Tgal
- -
06 4.441: Install automatic packing equipment $516,637 $100,000 - - - $516,637 -
TOTAL RECOMMENDED $676,683 $270,626 $5,341
81,188
kWh
$312
-
kW-mo/yr
$6,973
-
Tgal
$516,637 $147,420
TOTAL IMPLEMENTED $676,683 $270,626 $5,341
81,188
kWh
$312
-
kW-mo/yr
$6,973
-
Tgal
$516,637 $147,420
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs