ITAC Assessment: AM0080
ITAC logo
ITAC Assessment: AM0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ROLLING MILL MACHINERY
NAICS
n/a
SIC 3547: Rolling Mill Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,553 1,694,021
kWh
Natural Gas $37,182 7,290
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,101 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,501

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7141: Lower light fixtures in high ceiling areas $8,290 $3,400 $8,290
136,870
kWh
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,600 $3,500 $3,600
-
kWh
- -
03 4.231: Purchase equipment instead of leasing $4,500 $3,500 - - $4,500
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,480 - $4,480
96,424
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $440 $1,010 $440
7,327
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $470 $940 $470
9,965
kWh
- -
07 2.7261: Install timers and/or thermostats $172 $225 $46
879
kWh
$126
-
MMBtu
-
08 2.6122: Adjust vents to minimize energy use $149 - $149
3,224
kWh
- -
TOTAL RECOMMENDED $22,101 $12,575 $17,475
254,689
kWh
$126
-
MMBtu
$4,500
TOTAL IMPLEMENTED $18,501 $9,075 $13,875
254,689
kWh
$126
-
MMBtu
$4,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs