| Assessment Year | 1990 |
|---|---|
| Principal Product | ROLLING MILL MACHINERY |
| NAICS |
n/a
|
| SIC | 3547: Rolling Mill Machinery and Equipment |
| Sales Range | $5 M to 10M |
| # of Employees | 65 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $103,553 | 1,694,021 |
kWh
|
$0.061 |
| Natural Gas | $37,182 | 7,290 |
MMBtu
|
$5.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,101 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,501 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7141: Lower light fixtures in high ceiling areas | $8,290 | $3,400 |
$8,290
136,870
kWh
|
- | - | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,600 | $3,500 |
$3,600
-
kWh
|
- | - | |
| 03 | 4.231: Purchase equipment instead of leasing | $4,500 | $3,500 | - | - | $4,500 | |
| 04 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $4,480 | - |
$4,480
96,424
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $440 | $1,010 |
$440
7,327
kWh
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $470 | $940 |
$470
9,965
kWh
|
- | - | |
| 07 | 2.7261: Install timers and/or thermostats | $172 | $225 |
$46
879
kWh
|
$126
-
MMBtu
|
- | |
| 08 | 2.6122: Adjust vents to minimize energy use | $149 | - |
$149
3,224
kWh
|
- | - | |
| TOTAL RECOMMENDED | $22,101 | $12,575 |
$17,475
254,689
kWh
|
$126
-
MMBtu
|
$4,500 | ||
| TOTAL IMPLEMENTED | $18,501 | $9,075 |
$13,875
254,689
kWh
|
$126
-
MMBtu
|
$4,500 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs