Assessment Year | 1990 |
---|---|
Principal Product | OIL FIELD TUBING |
NAICS |
n/a
|
SIC | 3498: Fabricated Pipe and Pipe Fittings |
Sales Range | $1 M to 5M |
# of Employees | 27 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,548 | 1,092,028 |
kWh
|
$0.066 |
Natural Gas | $274,763 | 78,754 |
MMBtu
|
$3.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,629 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,629 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $13,200 | $51,900 |
$(-5,110.0)
(-55,686)
kWh
|
$18,310
-
MMBtu
|
|
02 | 2.8114: Change rate schedules or other changes in utility service | $10,385 | $12,000 |
$10,385
-
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,660 | $1,500 |
$5,660
149,472
kWh
|
- | |
04 | 2.6232: Install set-back timers | $910 | - |
$910
19,050
kWh
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $440 | - |
$440
8,792
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $34 | $31 |
$34
586
kWh
|
- | |
TOTAL RECOMMENDED | $30,629 | $65,431 |
$12,319
122,214
kWh
|
$18,310
-
MMBtu
|
||
TOTAL IMPLEMENTED | $30,629 | $65,431 |
$12,319
122,214
kWh
|
$18,310
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs