ITAC Assessment: AM0077
ITAC logo
ITAC Assessment: AM0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product OIL FIELD TUBING
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $1
M
to 5
M
# of Employees 27
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,548 1,092,028
kWh
Natural Gas $274,763 78,754
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,629

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $13,200 $51,900 $(-5,110.0)
(-55,686)
kWh
$18,310
-
MMBtu
02 2.8114: Change rate schedules or other changes in utility service $10,385 $12,000 $10,385
-
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,660 $1,500 $5,660
149,472
kWh
-
04 2.6232: Install set-back timers $910 - $910
19,050
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $440 - $440
8,792
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $34 $31 $34
586
kWh
-
TOTAL RECOMMENDED $30,629 $65,431 $12,319
122,214
kWh
$18,310
-
MMBtu
TOTAL IMPLEMENTED $30,629 $65,431 $12,319
122,214
kWh
$18,310
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs