ITAC Assessment: MA0820
ITAC logo
ITAC Assessment: MA0820
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Architectural coatings
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 28,927
ft2
Annual Production 335
Tgal
Production Hrs. Annual 2,340
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,966 189,760
kWh
Electricity Demand $24,794 981
kW-mo/yr
Electricity Fees $216 -
Fuel Oil #2 $15,855 875
MMBtu
TOTAL YEARLY COSTS $66,831
RECOMMENDED SAVINGS* $36,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $927

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $30,760 $129,192 $21,992
160,528
kWh
- $8,768
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,862 $11,220 $1,472
10,745
kWh
$1,390
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,673 $7,900 $864
6,306
kWh
$809
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $723 $300 $723
5,281
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $204 $200 $204
1,487
kWh
- -
TOTAL RECOMMENDED $36,222 $148,812 $25,255
184,347
kWh
$2,199
-
kW-mo/yr
$8,768
TOTAL IMPLEMENTED $927 $500 $927
6,768
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs