Assessment Year | 2002 |
---|---|
Principal Product | Pumps and compressors |
NAICS |
n/a
|
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $50 M to 100M |
# of Employees | 310 |
Plant Area |
181,500
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 2,730
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $135,861 | 8,091,775 |
kWh
|
$0.017 |
Electricity Demand | $238,333 | 32,521 |
kW-mo/yr
|
$7.33 |
Electricity Fees | $1,652 | - |
|
- |
Natural Gas | $35,787 | 6,317 |
MMBtu
|
$5.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,202 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,300 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $7,510 | $12,000 | - |
$7,510
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,150 | $540 |
$1,530
88,000
kWh
|
$2,400
-
kW-mo/yr
|
- | - | $(-780.0) | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $432 | $240 |
$204
11,740
kWh
|
$228
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $680 | - |
$1,410
80,700
kWh
|
$2,860
-
kW-mo/yr
|
- | - | $(-137.0) | $(-3,453.0) | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $1,240 | $3,630 |
$310
17,900
kWh
|
$930
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 3.5316: Contract a wood pallet recycling company | $4,890 | - | - | - | - |
$15,600
-
lb
|
$(-10,710.0) | - | - | |
07 | 3.8142: Distill contaminated solvents for reuse | $4,300 | $5,420 | - |
$(-160.0)
-
kW-mo/yr
|
$2,870
-
gal
|
- | - | - | $1,590 | |
TOTAL RECOMMENDED | $22,202 | $21,830 |
$3,454
198,340
kWh
|
$13,768
-
kW-mo/yr
|
$2,870
-
gal
|
$15,600
-
lb
|
$(-11,627.0) | $(-3,453.0) | $1,590 | ||
TOTAL IMPLEMENTED | $4,300 | $5,420 | - |
$(-160.0)
-
kW-mo/yr
|
$2,870
-
gal
|
- | - | - | $1,590 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs