ITAC Assessment: AM0069
ITAC logo
ITAC Assessment: AM0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ELECTRONIC FLOW COMPUTERS
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $10
M
to 50
M
# of Employees 420
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,538
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $562,737 11,094,080
kWh
Natural Gas $43,890 9,306
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,860

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $14,260 $47,700 $14,260
683,470
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $12,365 - - $12,365
-
MMBtu
03 2.6232: Install set-back timers $4,240 - $4,240
63,892
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,360 $1,000 $3,360
120,750
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $536 $116 $536
7,327
kWh
-
06 2.7226: Use computer programs to optimize hvac performance $2,485 $2,000 $2,485
89,390
kWh
-
07 2.7245: Use direct air supply to exhaust hoods $1,110 $4,000 - $1,110
-
MMBtu
TOTAL RECOMMENDED $38,356 $54,816 $24,881
964,829
kWh
$13,475
-
MMBtu
TOTAL IMPLEMENTED $21,860 $48,700 $21,860
868,112
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs