Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0065 #08 Y:2010 Install compressor air intakes in coolest locations $510 $50
DL0065 #07 Y:2010 Use or replace with energy efficient substitutes $1,530 $3,280
DL0065 #06 Y:2010 Utilize higher efficiency lamps and/or ballasts $2,834 $2,409
DL0065 #05 Y:2010 Use solar heat to make electricty $22,650 $328,687
DL0065 #04 Y:2010 Develop a repair/replace policy $3,970 $1,158
DL0065 #03 Y:2010 Utilize energy-efficient belts and other improved mechanisms $5,460 $3,680
DL0065 #02 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $8,000 $22,400
DL0065 #01 Y:2010 Use or replace with energy efficient substitutes $14,500 $30,600
DL0064 #04 Y:2010 Upgrade controls on compressors $7,030 $11,300
DL0064 #03 Y:2010 Use heat in flue gases to preheat products or materials $19,935 $20,500
DL0064 #02 Y:2010 Use or replace with energy efficient substitutes $7,944 $5,080
DL0064 #01 Y:2010 Recharge batteries on during off-peak demand periods $707 $100
DL0063 #18 Y:2010 Utilize controls to operate equipment only when needed $733 $615
DL0063 #17 Y:2010 Insulate bare equipment $3,993 $30,400
DL0063 #16 Y:2010 Install compressor air intakes in coolest locations $3,700 $2,100
DL0063 #15 Y:2010 Close off unneeded steam lines $3,627 $400
DL0063 #14 Y:2010 Re-use or recycle hot or cold process exhaust air $7,338 $19,300
DL0063 #13 Y:2010 Recover waste heat from equipment $10,700 $3,900
DL0063 #12 Y:2010 Install / repair insulation on steam lines $11,600 $1,585
DL0063 #11 Y:2010 Install occupancy sensors $12,978 $1,012