Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,733

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0378 #06 Y:2025 Use solar heat to make electricty $196,374 $1,560,000
MZ0378 #05 Y:2025 Recover waste heat from equipment $10,844 $12,060
MZ0378 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,470 $750
MZ0378 #03 Y:2025 Install occupancy sensors $4,373 $750
MZ0378 #02 Y:2025 Reduce illumination to minimum necessary levels $26,585 $49,000
MZ0378 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,972 $3,500
MZ0376 #08 Y:2025 Reduce ventilation air $3,456 $6,974
MZ0376 #07 Y:2025 Use solar heat to make electricty $86,491 $702,000
MZ0376 #06 Y:2025 Re-use or recycle hot or cold process exhaust air $4,289 $14,380
MZ0376 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $8,296 $7,200
MZ0376 #04 Y:2025 Replace existing chiller with high efficiency model $2,889 $18,327
MZ0376 #03 Y:2025 Use most efficient type of electric motors $7,548 $54,000
MZ0376 #02 Y:2025 Remove or close off unneeded compressed air lines $916 $365
MZ0376 #01 Y:2025 Install occupancy sensors $4,145 $1,560
MZ0377 #08 Y:2025 Eliminate or reduce compressed air usage $1,503 $3,660
MZ0377 #07 Y:2025 Meter recycled water (to reduce sewer charges) $31,698 $9,040
MZ0377 #06 Y:2025 Use or replace with energy efficient substitutes $26,142 $43,500
MZ0377 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $769 $200
MZ0377 #04 Y:2025 Eliminate or reduce compressed air usage $4,340 $2,300
MZ0377 #03 Y:2025 Utilize energy-efficient belts and other improved mechanisms $871 -