3,022
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UL2603 #07 Y:2026 | 07 | 2026 | Utilize higher efficiency lamps and/or ballasts | $10,696 | $20,685 |
n/a
|
| UL2603 #06 Y:2026 | 06 | 2026 | Reduce illumination to minimum necessary levels | $7,891 | - |
n/a
|
| UL2603 #05 Y:2026 | 05 | 2026 | Use solar heat to make electricty | $102,792 | $1,093,593 |
n/a
|
| UL2603 #04 Y:2026 | 04 | 2026 | Lower ceiling to reduce conditioned space | $16,549 | $21,600 |
n/a
|
| UL2603 #03 Y:2026 | 03 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $51,923 | $8,888 |
n/a
|
| UL2603 #02 Y:2026 | 02 | 2026 | Optimize plant power factor | $146,871 | $41,841 |
n/a
|
| UL2603 #01 Y:2026 | 01 | 2026 | Use outside cold water source as a supply of cooling water | $70,864 | $583,665 |
n/a
|
| UL2601 #07 Y:2026 | 07 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $6,800 | - |
n/a
|
| UL2601 #06 Y:2026 | 06 | 2026 | Minimize operation of equipment maintained in standby condition | $2,209 | - |
n/a
|
| UL2601 #05 Y:2026 | 05 | 2026 | Install occupancy sensors | $901 | $1,397 |
n/a
|
| UL2601 #04 Y:2026 | 04 | 2026 | Reduce illumination to minimum necessary levels | $1,551 | - |
n/a
|
| UL2601 #03 Y:2026 | 03 | 2026 | Use solar heat to make electricty | $35,670 | $476,148 |
n/a
|
| UL2601 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,308 | $945 |
n/a
|
| UL2601 #01 Y:2026 | 01 | 2026 | Optimize plant power factor | $5,606 | $8,923 |
n/a
|
| TT0349 #12 Y:2025 | 12 | 2025 | Install occupancy sensors | $1,209 | $1,380 |
n/a
|
| TT0349 #11 Y:2025 | 11 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $6,862 | $23,400 |
n/a
|
| TT0349 #10 Y:2025 | 10 | 2025 | Use power during off-peak periods | $11,088 | - |
n/a
|
| TT0349 #09 Y:2025 | 09 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $19,958 | $405 |
n/a
|
| TT0349 #08 Y:2025 | 08 | 2025 | Eliminate or reduce compressed air usage | $26,144 | $122,000 |
n/a
|
| TT0349 #07 Y:2025 | 07 | 2025 | Minimize operation of equipment maintained in standby condition | $31,487 | $9,660 |