Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other miscellaneous food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0238 #05 Y:2020 Utilize energy-efficient belts and other improved mechanisms $979 $240
IC0238 #04 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $1,791 $83
IC0238 #03 Y:2020 Use waste heat from hot flue gases to preheat $781 $1,758
IC0238 #02 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $14,907 $5,000
IC0238 #01 Y:2020 Install vinyl strip / high speed / air curtain doors $31,874 $24,382
IC0207 #04 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $5,736 $7,996
IC0207 #03 Y:2018 Reduce the pressure of compressed air to the minimum required $3,822 $290
IC0207 #02 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $15,473 $13,820
IC0207 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $4,822 $7,531
BD0397 #08 Y:2011 Use most efficient type of electric motors $1,214 $5,820
BD0397 #07 Y:2011 Use adjustable frequency drive or multiple speed motors on existing system $2,439 $650
BD0397 #06 Y:2011 Install turbulators $4,508 $1,500
BD0397 #05 Y:2011 Install compressor air intakes in coolest locations $4,796 $765
BD0397 #04 Y:2011 Install occupancy sensors $6,237 $4,440
BD0397 #03 Y:2011 Use waste heat from hot flue gases to preheat $7,550 $6,000
BD0397 #02 Y:2011 Replace obsolete burners with more efficient ones $15,024 $14,500
BD0397 #01 Y:2011 Use hot process fluids to preheat incoming process fluids $23,085 $6,000