ITAC Assessment: IC0352
ITAC logo
ITAC Assessment: IC0352
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Office Space
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6541: Title Abstract Offices
Sales Range less than $500
k
# of Employees 100
Plant Area 65,270
ft2
Annual Production 1
units
Production Hrs. Annual 2,860
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,809 111,940
kWh
Electricity Fees $2,243 -
Natural Gas $1,582 153
MMBtu
Other Gas $325 1
MMBtu
Other Energy $15,539 5,250
MMBtu
TOTAL YEARLY COSTS $32,499
RECOMMENDED SAVINGS* $5,316 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Ancillary Material Cost Savings
01 2.2113: Repair or replace steam traps $1,556 $8,651 - - $1,556
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,576 $20,545 $3,060
26,840
kWh
- - $516
03 2.6211: Conserve energy by efficient use of vending machines $122 $490 $122
1,066
kWh
- - -
04 3.4151: Minimize water usage $63 - $36
314
kWh
$27
-
MMBtu
- -
TOTAL RECOMMENDED $5,316 $29,686 $3,217
28,220
kWh
$27
-
MMBtu
$1,556
-
MMBtu
$516
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs