Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,699

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT1006 #09 Y:2026 Use solar heat to make electricty $463,700 $3,319,567
GT1006 #08 Y:2026 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $41,860 $258,750
GT1006 #07 Y:2026 Improve air circulation with destratification fans / other methods $4,198 $22,400
GT1006 #06 Y:2026 Turn off equipment during breaks, reduce operating time $396 $1,950
GT1006 #05 Y:2026 Eliminate or reduce compressed air usage $1,010 $2,400
GT1006 #04 Y:2026 Conserve energy by efficient use of vending machines $62 $135
GT1006 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,959 $1,850
GT1006 #02 Y:2026 Chill water to the highest temperature possible $6,481 $1,200
GT1006 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $18,456 $600
GT1005 #09 Y:2026 Replace hydraulic / pneumatic equipment with electric equipment $1,558 $5,400
GT1005 #08 Y:2026 Turn off equipment during breaks, reduce operating time $201 $260
GT1005 #07 Y:2026 Eliminate or reduce compressed air usage $2,644 $1,500
GT1005 #06 Y:2026 Conserve energy by efficient use of vending machines $86 $45
GT1005 #05 Y:2026 Reduce space conditioning during non-working hours $2,779 $750
GT1005 #04 Y:2026 Install timers on light switches in little used areas $6,314 $1,658
GT1005 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $9,904 $1,850
GT1005 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $2,777 $200
GT1005 #01 Y:2026 Apply for tax-free status for energy purchases $5,503 $200
GT1004 #09 Y:2026 Optimize plant power factor $2,865 $16,238
GT1004 #08 Y:2026 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $131,105 $517,500