Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,599

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0995 #08 Y:2024 Use solar heat to make electricty $55,545 $269,534
GT0995 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,769 $1,850
GT0995 #06 Y:2024 Turn off equipment during breaks, reduce operating time $746 $567
GT0995 #05 Y:2024 Utilize controls to operate equipment only when needed $469 $313
GT0995 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $432 $200
GT0995 #03 Y:2024 Eliminate or reduce compressed air usage $1,796 $500
GT0995 #02 Y:2024 Conserve energy by efficient use of vending machines $385 $90
GT0995 #01 Y:2024 Apply for tax-free status for energy purchases $1,089 $200
GT0994 #07 Y:2024 Use solar heat to make electricty $353,859 $1,694,463
GT0994 #06 Y:2024 Optimize plant power factor $2,063 $8,907
GT0994 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,752 $1,850
GT0994 #04 Y:2024 Eliminate or reduce compressed air usage $2,390 $1,000
GT0994 #03 Y:2024 Reduce space conditioning during non-working hours $12,243 $1,650
GT0994 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $12,462 $400
GT0994 #01 Y:2024 Apply for tax-free status for energy purchases $17,891 $200
KS2437 #09 Y:2024 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $65,208 $627,000
KS2437 #08 Y:2024 Install / repair insulation on steam lines $1,546 $4,072
KS2437 #07 Y:2024 Use most efficient type of electric motors $8,975 $88,610
KS2437 #06 Y:2024 Use solar heat to make electricty $47,984 $340,586
KS2437 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $18,870 $69,278