6,079
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0137 #09 Y:1997 | 09 | 1997 | Install equipment (eg compactor) to reduce disposal costs | $3,975 | $11,000 | |
| WV0137 #08 Y:1997 | 08 | 1997 | Recover and reuse cooling water | $1,307 | $1,300 | |
| WV0137 #07 Y:1997 | 07 | 1997 | Recover waste heat from equipment | $568 | $840 | |
| WV0137 #06 Y:1997 | 06 | 1997 | Insulate bare equipment | $1,532 | $1,120 | |
| WV0137 #05 Y:1997 | 05 | 1997 | Use waste heat from hot flue gases to preheat | $5,117 | $1,875 | |
| WV0137 #04 Y:1997 | 04 | 1997 | Install outside air damper / economizer on hvac unit | $527 | $2,700 | |
| WV0137 #03 Y:1997 | 03 | 1997 | Insulate bare equipment | $500 | $290 | |
| WV0137 #02 Y:1997 | 02 | 1997 | Use most efficient type of electric motors | $5,014 | $11,290 | |
| WV0137 #01 Y:1997 | 01 | 1997 | Utilize energy-efficient belts and other improved mechanisms | $554 | $440 | |
| UD0539 #04 Y:1997 | 04 | 1997 | Increase amount of condensate returned | $8,880 | $15,000 | |
| UD0539 #03 Y:1997 | 03 | 1997 | Reschedule plant operations or reduce load to avoid peaks | $39,482 | - | |
| UD0539 #02 Y:1997 | 02 | 1997 | Change rate schedules or other changes in utility service | $1,296 | - | |
| UD0539 #01 Y:1997 | 01 | 1997 | Use flow control valves on equipment to optimize water use | $2,210 | $3,000 | |
| OR0316 #07 Y:1997 | 07 | 1997 | Use most efficient type of electric motors | $1,142 | $4,167 | |
| OR0316 #06 Y:1997 | 06 | 1997 | Reduce the pressure of compressed air to the minimum required | $813 | - | |
| OR0316 #05 Y:1997 | 05 | 1997 | Turn off equipment during breaks, reduce operating time | $1,410 | - | |
| OR0316 #04 Y:1997 | 04 | 1997 | Replace electrically-operated equipment with fossil fuel equipment | $6,025 | $31,400 | |
| OR0316 #03 Y:1997 | 03 | 1997 | Reduce illumination to minimum necessary levels | $997 | $2,560 | |
| OR0316 #02 Y:1997 | 02 | 1997 | Use fixtures to reduce machine changeout times | $13,730 | $9,350 | |
| OR0316 #01 Y:1997 | 01 | 1997 | Optimize plant power factor | $1,044 | $6,400 |