ITAC Assessment: WV0137
ITAC logo
ITAC Assessment: WV0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Dry Dog Food
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 14,000
ft2
Annual Production 41,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,252 2,928,253
kWh
Natural Gas $188,557 26,592
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,032

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $554 $440 $554
14,361
kWh
- - -
02 2.4133: Use most efficient type of electric motors $5,014 $11,290 $5,014
127,491
kWh
- - -
03 2.2511: Insulate bare equipment $500 $290 - $500
-
MMBtu
- -
04 2.7241: Install outside air damper / economizer on hvac unit $527 $2,700 $527
13,775
kWh
- - -
05 2.2414: Use waste heat from hot flue gases to preheat $5,117 $1,875 - $5,117
-
MMBtu
- -
06 2.2511: Insulate bare equipment $1,532 $1,120 - $1,532
-
MMBtu
- -
07 2.2437: Recover waste heat from equipment $568 $840 - $568
-
MMBtu
- -
08 3.4115: Recover and reuse cooling water $1,307 $1,300 - - - $1,307
-
Tgal
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,975 $11,000 - - $3,975 -
10 3.5315: Lease / purchase baler; sell cardboard to recycler $1,512 - - - $1,512 -
11 4.112: Replace old machine with new automatic multi-station tool $49,920 $15,000 - - $49,920 -
TOTAL RECOMMENDED $70,526 $45,855 $6,095
155,627
kWh
$7,717
-
MMBtu
$55,407 $1,307
-
Tgal
TOTAL IMPLEMENTED $59,032 $28,140 $5,568
141,852
kWh
$2,032
-
MMBtu
$51,432 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs