ITAC Assessment: UD0539
ITAC logo
ITAC Assessment: UD0539
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Crepe paper, Drum lining paper
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 67,300
ft2
Annual Production 3,168
ton
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,470 1,425,850
kWh
Electricity Demand $61,116 5,556
kW-mo/yr
Natural Gas $144,643 37,476
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,868 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,386

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 3.4156: Use flow control valves on equipment to optimize water use $2,210 $3,000 - - - $2,210
-
Tgal
02 2.8114: Change rate schedules or other changes in utility service $1,296 - - $1,296 - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $39,482 - $39,482
-
kW-mo/yr
- - -
04 2.2121: Increase amount of condensate returned $8,880 $15,000 - - $6,357
-
MMBtu
$2,523
-
Tgal
TOTAL RECOMMENDED $51,868 $18,000 $39,482
-
kW-mo/yr
$1,296 $6,357
-
MMBtu
$4,733
-
Tgal
TOTAL IMPLEMENTED $12,386 $18,000 - $1,296 $6,357
-
MMBtu
$4,733
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs