Assessment Year | 1997 |
---|---|
Principal Product | Pre-Engineered Metal Building Systems |
NAICS |
n/a
|
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 134 |
Plant Area |
108,000
ft2
|
Annual Production | 24,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $182,865 | 2,243,845 |
kWh
|
$0.081 |
Electricity Demand | $27,206 | 6,918 |
kW-mo/yr
|
$3.93 |
Natural Gas | $16,156 | 3,163 |
MMBtu
|
$5.11 |
LPG | $17,058 | 1,742 |
MMBtu
|
$9.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $72,525 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,935 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,912 | $15,660 |
$7,673
94,080
kWh
|
$1,239
-
kW-mo/yr
|
- | - | |
02 | 2.7134: Use photocell controls | $4,008 | $4,000 |
$3,509
43,083
kWh
|
$499
-
kW-mo/yr
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $904 | $1,271 |
$772
9,379
kWh
|
$132
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,248 | $4,065 |
$4,426
54,220
kWh
|
$822
-
kW-mo/yr
|
- | - | |
05 | 2.6218: Turn off equipment when not in use | $1,606 | $1,880 |
$1,506
18,464
kWh
|
$100
-
kW-mo/yr
|
- | - | |
06 | 2.1332: Convert combustion equipment to burn natural gas | $6,415 | $2,079 | - | - |
$6,415
-
MMBtu
|
- | |
07 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $3,636 | $12,250 |
$3,210
39,273
kWh
|
$426
-
kW-mo/yr
|
- | - | |
08 | 3.5316: Contract a wood pallet recycling company | $10,416 | $250 | - | - | - |
$10,416
-
lb
|
|
09 | 3.5313: Increase amount of waste recovered for resale | $979 | $350 | - | - | - |
$979
-
lb
|
|
10 | 3.5313: Increase amount of waste recovered for resale | $952 | - | - | - | - |
$952
-
lb
|
|
11 | 3.1191: Change procedures / equipment / operating conditions | $1,394 | - | - | - | - |
$1,394
-
lb
|
|
12 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $28,055 | $100,000 | - | - | - |
$28,055
-
lb
|
|
TOTAL RECOMMENDED | $72,525 | $141,805 |
$21,096
258,499
kWh
|
$3,218
-
kW-mo/yr
|
$6,415
-
MMBtu
|
$41,796
-
lb
|
||
TOTAL IMPLEMENTED | $26,935 | $9,545 |
$6,704
82,063
kWh
|
$1,054
-
kW-mo/yr
|
$6,415
-
MMBtu
|
$12,762
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs