ITAC Assessment: SF0126
ITAC logo
ITAC Assessment: SF0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Pre-Engineered Metal Building Systems
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 134
Plant Area 108,000
ft2
Annual Production 24,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,865 2,243,845
kWh
Electricity Demand $27,206 6,918
kW-mo/yr
Natural Gas $16,156 3,163
MMBtu
LPG $17,058 1,742
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,525 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,935

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,912 $15,660 $7,673
94,080
kWh
$1,239
-
kW-mo/yr
- -
02 2.7134: Use photocell controls $4,008 $4,000 $3,509
43,083
kWh
$499
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $904 $1,271 $772
9,379
kWh
$132
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,248 $4,065 $4,426
54,220
kWh
$822
-
kW-mo/yr
- -
05 2.6218: Turn off equipment when not in use $1,606 $1,880 $1,506
18,464
kWh
$100
-
kW-mo/yr
- -
06 2.1332: Convert combustion equipment to burn natural gas $6,415 $2,079 - - $6,415
-
MMBtu
-
07 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $3,636 $12,250 $3,210
39,273
kWh
$426
-
kW-mo/yr
- -
08 3.5316: Contract a wood pallet recycling company $10,416 $250 - - - $10,416
-
lb
09 3.5313: Increase amount of waste recovered for resale $979 $350 - - - $979
-
lb
10 3.5313: Increase amount of waste recovered for resale $952 - - - - $952
-
lb
11 3.1191: Change procedures / equipment / operating conditions $1,394 - - - - $1,394
-
lb
12 3.2123: Convert to high volume low pressure (hvlp) paint guns $28,055 $100,000 - - - $28,055
-
lb
TOTAL RECOMMENDED $72,525 $141,805 $21,096
258,499
kWh
$3,218
-
kW-mo/yr
$6,415
-
MMBtu
$41,796
-
lb
TOTAL IMPLEMENTED $26,935 $9,545 $6,704
82,063
kWh
$1,054
-
kW-mo/yr
$6,415
-
MMBtu
$12,762
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs