5,175
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0288 #02 Y:2003 | 02 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,141 | $360 | |
| WV0288 #01 Y:2003 | 01 | 2003 | Use waste heat from hot flue gases to preheat | $12,469 | $2,195 | |
| NC0280 #09 Y:2003 | 09 | 2003 | Utilize higher efficiency lamps and/or ballasts | $745 | $686 | |
| NC0280 #08 Y:2003 | 08 | 2003 | Make a practice of turning off lights when not needed | $2,341 | $2,060 | |
| NC0280 #07 Y:2003 | 07 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,201 | $700 | |
| NC0280 #06 Y:2003 | 06 | 2003 | Establish a preventative maintenance program | $4,062 | $5,600 | |
| NC0280 #05 Y:2003 | 05 | 2003 | Install motor voltage controller on lightly loaded motors | $19,146 | $6,453 | |
| NC0280 #04 Y:2003 | 04 | 2003 | Use hot process fluids to preheat incoming process fluids | $24,049 | $79,415 | n/a |
| NC0280 #03 Y:2003 | 03 | 2003 | Use waste heat from hot flue gases to preheat incoming fluids | $109,628 | $121,591 | n/a |
| NC0280 #02 Y:2003 | 02 | 2003 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $69,623 | $360,000 | |
| NC0280 #01 Y:2003 | 01 | 2003 | Reschedule plant operations or reduce load to avoid peaks | $18,958 | $500 | |
| MA0549 #11 Y:2003 | 11 | 2003 | Disconnect ballasts | $197 | $60 | |
| MA0549 #10 Y:2003 | 10 | 2003 | Insulate bare equipment | $463 | $451 | |
| MA0549 #09 Y:2003 | 09 | 2003 | Re-size charging openings or add movable cover or door | $1,021 | $1,100 | |
| MA0549 #08 Y:2003 | 08 | 2003 | Install occupancy sensors | $1,041 | $896 | |
| MA0549 #07 Y:2003 | 07 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,794 | $315 | |
| MA0549 #06 Y:2003 | 06 | 2003 | Lower temperature during the winter season and vice-versa | $4,412 | - | |
| MA0549 #05 Y:2003 | 05 | 2003 | Use heat in flue gases to preheat products or materials | $5,232 | $11,500 | |
| MA0549 #04 Y:2003 | 04 | 2003 | Improve combustion control capability | $8,653 | $16,100 | |
| MA0549 #03 Y:2003 | 03 | 2003 | Replace existing equipment with more suitable substitutes | $10,668 | $2,066 |