Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,760

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0142 #08 Y:1995 Install occupancy sensors $4,666 $8,700
AS0142 #07 Y:1995 Utilize higher efficiency lamps and/or ballasts $39,071 $92,498
AS0142 #06 Y:1995 Use or replace with energy efficient substitutes $12,763 $39,855
AS0142 #05 Y:1995 Heat water during off-peak periods and store for later use $45,069 $181,200
AS0142 #04 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $356 $100
AS0142 #03 Y:1995 Use or replace with energy efficient substitutes $8,667 $25,900
AS0142 #02 Y:1995 Utilize energy-efficient belts and other improved mechanisms $3,963 -
AS0142 #01 Y:1995 Use most efficient type of electric motors $9,046 $8,327
SD0112 #11 Y:1995 Use high quality scrap (low sulfur) to reduce hazardous sludge generation $1,069 $1,000
SD0112 #10 Y:1995 Use in-process recycling whenever possible $2,184 -
SD0112 #09 Y:1995 Reduce solution drag-out to prevent solution loss $730 $250
SD0112 #08 Y:1995 Install timers and/or thermostats $1,306 $849
SD0112 #07 Y:1995 Install occupancy sensors $494 $599
SD0112 #06 Y:1995 Install spectral reflectors / delamp $5,047 $4,305
SD0112 #05 Y:1995 Utilize higher efficiency lamps and/or ballasts $3,168 $6,733
SD0112 #04 Y:1995 Insulate bare equipment $2,282 $563
SD0112 #03 Y:1995 Use cooling tower or economizer to replace chiller cooling $1,144 $1,600
SD0112 #02 Y:1995 Cover open tanks $1,015 $250
SD0112 #01 Y:1995 Use most efficient type of electric motors $1,149 $450
ND0210 #09 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $25 $185