ITAC Assessment: AS0144
ITAC logo
ITAC Assessment: AS0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3769: Guided Missile Space Vehicle Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 60,000
ft2
Annual Production 21,600
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $287,549 3,907,093
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,445 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,677

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $42,045 $63,900 $42,045
519,344
kWh
-
02 2.7232: Replace existing hvac unit with high efficiency model $22,768 $58,000 $22,768
276,964
kWh
-
03 2.4133: Use most efficient type of electric motors $4,451 $5,634 $4,451
50,996
kWh
-
04 2.4314: Use synthetic lubricant $1,119 $1,380 $1,119
9,965
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $704 - - $704
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $358 $1,305 $358
3,517
kWh
-
TOTAL RECOMMENDED $71,445 $130,219 $70,741
860,786
kWh
$704
TOTAL IMPLEMENTED $48,677 $72,219 $47,973
583,822
kWh
$704
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs