| OD0043 #05 Y:1995 | 05 | 1995 | Use most efficient type of electric motors | $296 | $153 | |
| OD0043 #04 Y:1995 | 04 | 1995 | Eliminate leaks in inert gas and compressed air lines/ valves | $617 | $1,000 | |
| OD0043 #03 Y:1995 | 03 | 1995 | Use photocell controls | $2,498 | $340 | |
| OD0043 #02 Y:1995 | 02 | 1995 | Utilize higher efficiency lamps and/or ballasts | $4,495 | $1,756 | |
| OD0043 #01 Y:1995 | 01 | 1995 | Install timers and/or thermostats | $4,482 | $1,755 | |
| GT0562 #02 Y:1995 | 02 | 1995 | Reschedule plant operations or reduce load to avoid peaks | $67,980 | - | |
| GT0562 #01 Y:1995 | 01 | 1995 | Change rate schedules or other changes in utility service | $82,460 | - | |
| WI0244 #10 Y:1995 | 10 | 1995 | Utilize higher efficiency lamps and/or ballasts | $310 | $631 | n/a |
| WI0244 #09 Y:1995 | 09 | 1995 | Install occupancy sensors | $483 | $225 | n/a |
| WI0244 #08 Y:1995 | 08 | 1995 | Utilize energy-efficient belts and other improved mechanisms | $504 | - | n/a |
| WI0244 #07 Y:1995 | 07 | 1995 | Analyze flue gas for proper air/fuel ratio | $1,594 | $500 | n/a |
| WI0244 #06 Y:1995 | 06 | 1995 | Cover open tanks | $4,164 | $2,400 | n/a |
| WI0244 #05 Y:1995 | 05 | 1995 | Install compressor air intakes in coolest locations | $750 | $640 | n/a |
| WI0244 #04 Y:1995 | 04 | 1995 | Recover waste heat from equipment | $2,299 | $1,000 | n/a |
| WI0244 #03 Y:1995 | 03 | 1995 | Eliminate leaks in inert gas and compressed air lines/ valves | $11,927 | $270 | n/a |
| WI0244 #02 Y:1995 | 02 | 1995 | Insulate glazing, walls, ceilings, and roofs | $12,574 | $6,250 | n/a |
| WI0244 #01 Y:1995 | 01 | 1995 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $29,259 | $120,000 | n/a |
| UD0467 #03 Y:1995 | 03 | 1995 | Replace existing chiller with high efficiency model | $23,135 | $150,000 | |
| UD0467 #02 Y:1995 | 02 | 1995 | Reschedule plant operations or reduce load to avoid peaks | $5,434 | $3,000 | |
| UD0467 #01 Y:1995 | 01 | 1995 | Purchase gas directly from a contract gas supplier | $68,000 | $72,000 |