Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product sleeper boxes
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $50
M
to 100
M
# of Employees 258
Plant Area 240,000
ft2
Annual Production 9,000
units
Production Hrs. Annual 7,854
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,056 2,049,238
kWh
Natural Gas $16,652 3,867
MMBtu
LPG $42,187 11,022
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,403 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,416 $80 $3,416
76,788
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,692 $320 $2,692
66,823
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $3,686 $1,790 $3,686
81,184
kWh
-
04 2.4314: Use synthetic lubricant $855 $265 $855
19,050
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,812 $10,944 $4,812
107,268
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,525 $3,768 $2,525
56,565
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $201 - $201
4,982
kWh
-
08 2.4133: Use most efficient type of electric motors $2,306 $5,704 $2,306
54,220
kWh
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,557 $1,809 $1,557
13,775
kWh
-
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $553 - $553
13,775
kWh
-
11 3.1192: Reduce scrap production $37,800 $1,250 - $37,800
-
lb
TOTAL RECOMMENDED $60,403 $25,930 $22,603
494,430
kWh
$37,800
-
lb
TOTAL IMPLEMENTED $17,630 $22,791 $17,630
403,867
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs