Assessment Year | 1995 |
---|---|
Principal Product | sleeper boxes |
NAICS |
n/a
|
SIC | 3713: Truck and Bus Bodies |
Sales Range | $50 M to 100M |
# of Employees | 258 |
Plant Area |
240,000
ft2
|
Annual Production | 9,000
units
|
Production Hrs. Annual | 7,854
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $148,056 | 2,049,238 |
kWh
|
$0.072 |
Natural Gas | $16,652 | 3,867 |
MMBtu
|
$4.31 |
LPG | $42,187 | 11,022 |
MMBtu
|
$3.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $60,403 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,630 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,416 | $80 |
$3,416
76,788
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,692 | $320 |
$2,692
66,823
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $3,686 | $1,790 |
$3,686
81,184
kWh
|
- | |
04 | 2.4314: Use synthetic lubricant | $855 | $265 |
$855
19,050
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,812 | $10,944 |
$4,812
107,268
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,525 | $3,768 |
$2,525
56,565
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $201 | - |
$201
4,982
kWh
|
- | |
08 | 2.4133: Use most efficient type of electric motors | $2,306 | $5,704 |
$2,306
54,220
kWh
|
- | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,557 | $1,809 |
$1,557
13,775
kWh
|
- | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $553 | - |
$553
13,775
kWh
|
- | |
11 | 3.1192: Reduce scrap production | $37,800 | $1,250 | - |
$37,800
-
lb
|
|
TOTAL RECOMMENDED | $60,403 | $25,930 |
$22,603
494,430
kWh
|
$37,800
-
lb
|
||
TOTAL IMPLEMENTED | $17,630 | $22,791 |
$17,630
403,867
kWh
|
- | ||