Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,201

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MO0153 #08 Y:1995 Install compressor air intakes in coolest locations $4,192 $702
MO0153 #07 Y:1995 Utilize higher efficiency lamps and/or ballasts $193 $276
MO0153 #06 Y:1995 Utilize higher efficiency lamps and/or ballasts $5,648 $3,010
MO0153 #05 Y:1995 Utilize higher efficiency lamps and/or ballasts $2,743 $1,063
MO0153 #04 Y:1995 Use most efficient type of electric motors $2,849 $7,562
MO0153 #03 Y:1995 Utilize energy-efficient belts and other improved mechanisms $540 $365
MO0153 #02 Y:1995 Purchase gas directly from a contract gas supplier $26,406 $300
MO0153 #01 Y:1995 Analyze flue gas for proper air/fuel ratio $2,220 $995
DS0031 #05 Y:1995 Install compressor air intakes in coolest locations $19 $36
DS0031 #04 Y:1995 Change rate schedules or other changes in utility service $26,314 $147,200
DS0031 #03 Y:1995 Use most efficient type of electric motors $770 $2,642
DS0031 #02 Y:1995 Turn off equipment when not in use $217 -
DS0031 #01 Y:1995 Utilize higher efficiency lamps and/or ballasts $9,527 $35,625
AS0149 #09 Y:1995 Replace existing hvac unit with high efficiency model $18,285 $54,010
AS0149 #08 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $485 $220
AS0149 #07 Y:1995 Insulate bare equipment $234 $490
AS0149 #06 Y:1995 Use adjustable frequency drive or multiple speed motors on existing system $239 $1,072
AS0149 #05 Y:1995 Utilize energy-efficient belts and other improved mechanisms $734 -
AS0149 #04 Y:1995 Use most efficient type of electric motors $3,194 $4,093
AS0149 #03 Y:1995 Reduce illumination to minimum necessary levels $393 -