ITAC Assessment: HO0111
ITAC logo
ITAC Assessment: HO0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Electronic Components
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 41
Plant Area 29,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 2,275
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,445 318,875
kWh
Natural Gas $7,148 947
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,398 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,207 $8,017 $5,207
28,429
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $330 $556 $330
1,758
kWh
-
03 2.4133: Use most efficient type of electric motors $122 $237 $122
586
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $296 $200 $296
1,758
kWh
-
05 2.2511: Insulate bare equipment $173 $95 - $173
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $197 $206 - $197
-
MMBtu
07 2.7135: Install occupancy sensors $862 $400 $862
4,103
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $211 $60 $211
1,172
kWh
-
TOTAL RECOMMENDED $7,398 $9,771 $7,028
37,806
kWh
$370
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs