ITAC Assessment: IC0233
ITAC logo
ITAC Assessment: IC0233
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Plastic Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 36
Plant Area 47,250
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,195 1,585,000
kWh
Electricity Demand $53,900 3,906
kW-mo/yr
Electricity Fees $7,615 -
Natural Gas $7,603 1,302
MMBtu
TOTAL YEARLY COSTS $175,313
RECOMMENDED SAVINGS* $8,935 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $329 $167 $216
3,229
kWh
$112
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,040 $167 $2,040
30,313
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,788 $861 $2,000
29,713
kWh
$789
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,778 $2,589 $2,710
40,260
kWh
$1,068
-
kW-mo/yr
TOTAL RECOMMENDED $8,935 $3,784 $6,966
103,516
kWh
$1,969
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs